Project Phase 4 – New Booking Office

Phase 4 of our project, the building of a brand new booking office, has also started simultaneously as phase 3.
The overall look of the building is designed to match the style of our workshop built in 2012 with various features from our history as well as that of the Great Western Railway, including original cast iron brackets from Gloucester railway station.
Once the footings were excavated a steel reinforcement was installed prior to the pouring of the concrete to form the foundations.
Following the curing of the concrete, Steel posts have been installed to support the cast iron entrance awnings. The construction of the blockwork walls has begun and the building has started to take shape.